{"id":193,"date":"2014-05-16T16:57:57","date_gmt":"2014-05-16T20:57:57","guid":{"rendered":"http:\/\/markstapletonsteelconsulting.us\/projects\/?p=193"},"modified":"2014-05-23T16:21:31","modified_gmt":"2014-05-23T20:21:31","slug":"work-on-the-acadian-seafarer","status":"publish","type":"post","link":"https:\/\/markstapletonsteelconsulting.us\/projects\/work-on-the-acadian-seafarer\/","title":{"rendered":"Work on The Acadian Seafarer"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>The MV Acadian Seafarer was built by Halter Marine in 1979 with the dimensions 217&#8242; x 44&#8242; x 16&#8242; The vessel is Diesel Electric with 7,200 Shp. a 650 hp. Bow Thruster and is capable of a speed of 13 knots.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_199\" style=\"width: 310px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-6.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-199\" class=\"size-full wp-image-199\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-6.jpg\" alt=\"The MV Acadian Seafarer docked in Galveston, Texas.\" width=\"300\" height=\"240\" \/><\/a><p id=\"caption-attachment-199\" class=\"wp-caption-text\">The MV Acadian Seafarer docked in Galveston, Texas.<\/p><\/div>\n<div id=\"attachment_64\" style=\"width: 287px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/04\/MV-AcadianSeafarer2-e1400273844445.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-64\" class=\"size-full wp-image-64\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/04\/MV-AcadianSeafarer2-e1400273844445.jpg\" alt=\"Inside the control room of the Motor Vessel Acadian Seafarer\" width=\"277\" height=\"281\" \/><\/a><p id=\"caption-attachment-64\" class=\"wp-caption-text\">Inside the control room of the MV Acadian Seafarer<\/p><\/div>\n<div id=\"attachment_147\" style=\"width: 310px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/MV-AcadianSeafarer-01.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-147\" class=\"wp-image-147 size-medium\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/MV-AcadianSeafarer-01-300x191.jpg\" alt=\"MV AcadianSeafarer 01\" width=\"300\" height=\"191\" srcset=\"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/MV-AcadianSeafarer-01-300x191.jpg 300w, https:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/MV-AcadianSeafarer-01.jpg 439w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-147\" class=\"wp-caption-text\">Auxiliary power Detroit diesel 8V71 connected to 150kw generator.<\/p><\/div>\n<div id=\"attachment_65\" style=\"width: 294px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/04\/MV-AcadianSeafarer3.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-65\" class=\"wp-image-65 size-full\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/04\/MV-AcadianSeafarer3.jpg\" alt=\"MV AcadianSeafarer3\" width=\"284\" height=\"281\" \/><\/a><p id=\"caption-attachment-65\" class=\"wp-caption-text\">Power is supplied by five (5) 1,200 hp. Detroit Diesel 16V149 series naturally aspirated engines. The engines are electric started using two high torque 24VDC started motors per engine supplied by a bank of eight (8), six (6) cell 24V Lead Acid Batteries, which are continuously charged by a LaMarche constavolt system.<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_196\" style=\"width: 310px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-3.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-196\" class=\"size-full wp-image-196\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-3.jpg\" alt=\"    The pump room.\" width=\"300\" height=\"233\" \/><\/a><p id=\"caption-attachment-196\" class=\"wp-caption-text\">The pump room.<\/p><\/div>\n<div id=\"attachment_194\" style=\"width: 310px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapleton-ASF-New1.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-194\" class=\"wp-image-194 size-full\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapleton-ASF-New1.jpg\" alt=\"Stapleton-ASF-New1\" width=\"300\" height=\"235\" \/><\/a><p id=\"caption-attachment-194\" class=\"wp-caption-text\">The walkway from the pump room to the motor room.<\/p><\/div>\n<div id=\"attachment_195\" style=\"width: 160px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/StapASF-2.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-195\" class=\"wp-image-195 size-thumbnail\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/StapASF-2-150x150.jpg\" alt=\"StapASF-2\" width=\"150\" height=\"150\" \/><\/a><p id=\"caption-attachment-195\" class=\"wp-caption-text\">The DC horizontal shaft motor room.<\/p><\/div>\n<div id=\"attachment_197\" style=\"width: 160px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stap-ASF-4.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-197\" class=\"wp-image-197 size-thumbnail\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stap-ASF-4-150x150.jpg\" alt=\"Stap-ASF-4\" width=\"150\" height=\"150\" \/><\/a><p id=\"caption-attachment-197\" class=\"wp-caption-text\">The hydraulic steering gear system<\/p><\/div>\n<div id=\"attachment_198\" style=\"width: 160px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-5.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-198\" class=\"wp-image-198 size-thumbnail\" src=\"http:\/\/markstapletonsteelconsulting.us\/projects\/wp-content\/uploads\/2014\/05\/Stapl-ASF-5-150x150.jpg\" alt=\"Stapl-ASF-5\" width=\"150\" height=\"150\" \/><\/a><p id=\"caption-attachment-198\" class=\"wp-caption-text\">The steering gear room.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The MV Acadian Seafarer was built by Halter Marine in 1979 with the dimensions 217&#8242; x 44&#8242; x 16&#8242; The vessel is Diesel Electric with 7,200 Shp. a 650 hp. Bow Thruster and is capable of a speed of &hellip; <a href=\"https:\/\/markstapletonsteelconsulting.us\/projects\/work-on-the-acadian-seafarer\/\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19],"tags":[],"class_list":["post-193","post","type-post","status-publish","format-standard","hentry","category-mv-acadian-seafarer"],"_links":{"self":[{"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/posts\/193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/comments?post=193"}],"version-history":[{"count":5,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/posts\/193\/revisions"}],"predecessor-version":[{"id":238,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/posts\/193\/revisions\/238"}],"wp:attachment":[{"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/media?parent=193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/categories?post=193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/markstapletonsteelconsulting.us\/projects\/wp-json\/wp\/v2\/tags?post=193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}