516.903.6173
Refer Mark ››
Mark O. Stapleton Steel Consulting
Ensure the fabrication of high quality, high-value
American-crafted products that are built to last the test of time.
Monthly Archives: May 2014
Picnic Table
Fri, May 23,
in category: Residential Work, SSI Steamboat Rd, Great Neck
Comments Off on Picnic Table
Projects
The categorical listing shows a a range of project types.
Timeline
The categorical listing shows a timeline of work from the Merchant Marines, through Stapleton Steel in Groton, CT.
Work on The Acadian Seafarer
The MV Acadian Seafarer was built by Halter Marine in 1979 with the dimensions 217′ x 44′ x 16′ The vessel is Diesel Electric with 7,200 Shp. a 650 hp. Bow Thruster and is capable of a speed of … Read more
USMMA, Kings Point, New York
Thu, May 15,
in category: Commercial Work, USMMA, Kings Point
Comments Off on USMMA, Kings Point, New York